Achievements

Home > About us > Achievements >
Abstract:In 2012 Scepco asked Top Well to perform a campaign of several wells involving running velocity strings with isolation packers and other downhole equipment.
Abstract:TOP WELL has performed snubbing services successfully throughout China including many main domestic oil and gas fields
Abstract:In Sept, 2007, TOP WELL used snubbing technology to pull the strings out of the hole of 5 wells under pressure in the West to East gas storage project which marks the successful com
Abstract:In 2008, Top Well was contracted to pull a tubing string that had obstructions in the bottom of the string from previous operations. The previous efforts had attempted to plug the t
 